The project included structural coordination, DC/AC systems, protection, monitoring and safe grid integration.

More case studies
Related Projects
Completed
Manufacturing
Factory Fire Detection & Hydrant System
Savar
Delivered an integrated life-safety system for a growing manufacturing facility.
View project →
Maintenance
Cement & Ceramics
Cement Plant Annual Shutdown Maintenance
Chattogram
Coordinated multidisciplinary inspection and corrective work during a tightly controlled shutdown.
View project →
Completed
Food & Beverage
Packaging Line Automation
Narayanganj
PLC and HMI modernization increased repeatability and reduced manual intervention.
View project →